CHP Power Plant, Germany

  • Scope: HVAC turn key
  • Type: Air cooled system 
  • Delivery Part: Cooling units, ventilation fans, ducts, pipes, insulation, local control systems and equipment. Heating pipes, water pump, valves, insulation and equipment.
  • Installation: Installation and supervision by GCC personnel
  • Commissioning: Maintenance training and commissioning of HVAC